| MegaPrime Project
At CFHT - 1
New upper
end arrival - March 28, 2001
The box on its way...
 |
 |
 |
| Just above Hale Pohaku |
Cooling down |
Up again... |
 |
 |
|
Nearly done...
|
At the summit!
|
The crane
 |
 |
|
|
It finally made it to the summit...
|
Crane preparation
|
Ready to start lifting up the IR upper end
|
The IR
upper end removal
 |
|
 |
|
The first half of the IR upper end on its way out of the dome...
|
 |
 |
|
|
and landing on the waiting truck.
|
The second half follows...
|
and both are together for their last journey.
|
Opening
the box
 |
|
 |
|
The upper end is very well packed. There is water there, but
no harm made to the ring! It has to be removed though...
|
 |
 |
|
before unwrapping...
|
what is probably Dan's biggest gift! ;)
|
The flying spider...
 |
|
|
The spiders are removed first.
|
Lifting
the ring
 |
 |
|
|
The ring is lifted from its box and moves over the edge of the
summit area to face the dome again.
|
 |
|
 |
|
The ring is lifted up to the dome slit and finally makes it
into the dome.
|
 |
|
On the floor!...
|
Last but not least, the Prime
Focus Environment Base...
 |
It is the last MegaPrime upper end component
to be removed from the box... |
MegaPrime
ring fit to the telescope - April 3/4, 2001
 |
| The MegaPrime ring on its way to the telescope top end... |
MegaPrime
Prime Focus Upper end Assembly - April 20, 2001
 |
 |
 |
The first leg of the new spider
is mounted on the ring
|
The PFEB is approaching
the four legs of the spider
|
The MegaPrime upper end is now assembled
and sits at the location where the F/35 upper end
used to sit...
|
|