MegaPrime Project

MegaCam Integration - June 10/28, 2002

New stuff on top...
Images are shown at half their size...



June 25
 
Camera is being prepared for window 
removal in the clean room
Window is in the open... ready to be cleaned
Window is back... MegaCam ready
to be pumped! From l. to r.,
Xavier, Remi, Les and Greg B.



June 21
 
On June 21, the camera is cold and hooked to the CFHT
acquisition system... Here is a dark in a not so dark room.



June 18
 
Camera ready to be cooled down 
Jukebox and camembert
Glycol chiller and He compressor
"Camembert" on the fake FSA



June 12
 
MegaCam cryostat on its cart 
in the camera lab 



June 7
 
MegaCam crates on their way to the summit 
June 7
MegaCam crates unloaded at the summit 
June 7