The MegaPrime Wide Field Corrector
Assembly at CFHT
Jan 26/27, 2002
After a last flight on an old
DC3 and a ride in the open air on a truck bed on a snowy morning,
the WFC cart finally made it
to the floor of the aluminizing room. Well, one more short flight!
Getting ready for the assembly
L3 being checked out before
going into the back body of the WFC
Same thing with L4...
L4 in place.
L2 out of its bag...
L2 ready to go in front body
Front body (with L2 mounted
inside) lowered on the cart
Back body on its way to the
top of the front body
WFC going upside down to get
ready for L1
The assembly crew of the day
(from left to right, G. Barrick, M. Boutin,
C. Veillet, S. Brotman) in front
of L1...
L1 lowered down... slowly!
Going horizontal (the only way
to get out of the bottom of the aluminizing room)
Corrector assembled (Sunday
Jan 26, 2002)
Looking through (making sure
no cover was left inside!)
Pressurizing the corrector (20
mb over the ambiant pressure)