| MegaPrime Project
The Wide Field Corrector construction
(being built at SAGEM/REOSC.)
WFC final tests - Dec. 2001
The WFC is being tested in horizontal position
as part of the final acceptance tests at
SAGEM/REOSC
|
WFC final assembly - Jul. 2001
|
|
|
The WFC top part is lowered on
the bottom part- Assembly last step! |
The WFC is ready for the first series of tests
to be made with the WFC in a vertical position.
Testing equipment is on the structure on top of the WFC.
|
WFC structure - Feb. 2001
 |
Testing the WFC dimensions...
2001-02-08 |
|