MegaPrime Project

The MegaPrime Wide Field Corrector

Moving from the aluminizing room up to the 5th floor

Jan 28, 2002
 


Ready to take off


1st flight


First landing


2nd flight


2nd landing, at 1st floor level


Back on wheels...


Back to vertical in the hatchway...


Wide Field Corrector hanging alone...


Back on the cart on the handling fixture


On its way up to 5th floor


Entering the dome


Above 5th floor!


Last landing of the day...


Final touch: a nice cover... with a very big zipper  ;)