REPORTS

Events

System Status Reviews

Minutes to the December 3, 2003 Status Review Meeting.  This meeting which was the first of several was intended to provide background for the current status of Fly-Eyes wavefront sensor demonstrator development.

Minutes to the January 26, 2004 Dewar Status Review Meeting. This summary is a review of a visit to IfA and GL Scientific to review the dewar contract with Gerry Luppino and to discuss the state of bimorph mirror development with Christ Ftacles.

Minutes to the March 1, 2004 Fly Eyes Review Meeting.  A continuation on the status of Fly-Eyes wavefront sensor demonstrator development.  A list of Action items follows:


Meetings

Minutes to the Requirement Summary meeting of September 29, 2003.  This meeting was an organizational meeting identifying the systems that would likely need upgrading to obtain the required performance for Pueo-Nui.  Several proposals were also identified.

Minutes to the December 5, 2003 Planning Meeting.  This meeting layed the foundation of the scope and goals of the Pueo-Nui project.  It also identified issues to be addressed and those which will not be addressed.  A list of actions were prepared with proposed time frames for completion of actions.



Action Items

December 3, 2003

Action 1 -     Derrick to ask Kanoa to make an e-mail alias
Action 2 -     Derrick to work with Laurie to set up "internal access only" web page
Action 3 -     Derrick to establish a schedule for regular monthly review meetings
Action 4 -     Visit with Gerry Luppino at GL Scientific to review the state of fabrication and remaining
                    development
Action 5 -     Jean-Charles to provide Derrick with availabe paper or electronic drawings of GL Scientific   
                    components
Action 6 -     Jean-Charles to provide Derrick with technical data sheets for the CCID-35s.
Action 7        Derrick to receive electronic or paper drawings of all hardware provided by GL Scientific
Action 8 -     Derrick to organize an in-house CFHT review of mechanical hardware be developed by
                    GL Scientific
Action 9 -     Greg Barrick to request that the spool of 100 um fiber optic be sent to CFHT
Action 10 -     Greg Barrick to provide technical specification and transmission data for this fiber optic material
Action 11 -     Pascal to provide technical drawings defining the V-groove geometry
Action 12 -     Derrick to organize a design brainstorm session to discuss and decide on details of how best to
                     mount the fiber optics to the V-groove platelets
Action 13 -    Derrick to organize brainstorm session to discuss and decide how to mount fiber optics at the
                      cryovessel vacuum feed
Action 14 -    Fiber optic to CCD alignment plan to be developed
Action 15 -    Kevin Ho to provide purchase order for a dedicated FlyEyes CCD controller
Action 16 -    Kevin Ho to provide purchase order for a dedicated CCD host computer
Action 17 -    Derrick to organize brainstorm session to discuss fiber optics mounting and connection options and
                      methods for producing them
Action 18 -    Jean-Charles to contact Nicolas Gorceix regarding recommendations for conclusions regarding
                     choice of fibers, connectors and mounting schemes

December 5, 2003

Action 19 -    Kevin Ho and Jim Thomas to discuss the modifications of the WFS electronics/SDSU host/RTC
                     interface. 
Action 20 -    Kevin to present the timing for the FlyEyes CCID-35
Action 21 -    Derrick to develop a simple CCD model for calculating curvature signals in order to estimate
                      signal nocie as a function of guide star magnitude.

January 26, 2004

Action 19 -    Christ to send Derrick a copy of the NICI optical error budget
Action 20 -    Gerry Luppino to send Kevin Ho a data sheet for the CCID-35 CCDs from Lincoln Labs
Action 21 -    Gerry Luppino to procure the 2 required hermetic electrical connectors needed for the external
                      interfaces to the FlyEyes cryovessel
Action 22 -    Kevin Ho to provide to Gerry Luppino the fanout printed curcuit board needed to interface the
                     CCID-35 package connector to mini-D edge connectors needed internally to the cryovessel
Action 23 -    Gerry Luppino to provide completely assembled and tested FlyEyes cryovessel, including all
                     internal wiring with CCDs mounted
Action 24 -    Kevin Ho to measure the X,Y, Z locations of each CCID-35 in its package and the location and
                     heights of bond wires
Action 25 -    Jean-Charles Cuillandre to request dimensionally correct mechanical drawings of CCID-35 and
                    package in electronic form

March 1, 2004

Action 26 -    Susan Brotman to follow-up with CeramOptek and report findings at next meeting
Action 27 -    Pascal to discuss with Grenoble staff while on-site at Grenoble options for mounting fiber ends in
                    V-Grooves.  Pascal to visit small firm specializing in these operations near Grenoble.
Action 28 -    Derrick and Pascal to discuss options and budget with Christian once costs for V-Groove approach
                      is clear, select a vendor and proceed with fiber array manufacturer.
Action 29 -    Derrick, Kevin, Jean-Charles and Olivier to decide on fiber lengths and geometries during summit
                      visit with AOB.
Action 30 -    Susan Brotman to produce short lengths of fiber terminated both then ends, and check                                     transmission.  Also to test transmission through a fiber-to-fiber coupling.
Action 31 -     Kevin to issue a CCID-35 geometry report
Action 32 -    Kevin to remind Gerry to we need the completed fiber optics X-Y stages delivered to CFHT
                     for translation measurements by mid-March.  Stage motions to be measured by end-March.
Action 33 -     Kevin will reivew carrier design for low-noise operation with JCC, JW and JB (Keck) and
                      possibly PO (IfA) by mid-March.
Action 34 -     Derrick to develop an outline document for transmission to Meudon/ESO prior to grou departure
                       to outline goals for visit. 



 
Contracts



Progress Reports
 
Memos and Correspondence

E-mail received from Jerome Paufique on April 13, 2004 regarding bimorph deformable mirror.  Data attached.