CFHT instrumentation usage and its impact on CFHT operations and on the CFHTLS
Veillet, C.

The current and foreseen status of the CFHT instrumentation will be presented, as a basis for discussion of its impact on CFHT operations and of the possible consequences on the CFHTLS in the coming years. 2005B time allocation should be known at the time of the workshop and could give a good indication of potential problems that could have to be faced to insure the success of the Legacy Survey at a time when the pressure on CFHT observing time is very high.