After deliberation during the Board of Director's meeting on 24th July, 2026, the CFHT Board of Directors, in consultation with the Executive Director, took note of the following SAC recommendations:
| Recommendation 1 | Cap on Dark Time Allocation to Associate Partners |
| Recommendation 2 | Community Survey Policy For Non-CFH collaborators |
| Recommendation 3 | Minimum Number of Nights for PI Time |
| Recommendation 4 | Extension of Unions+ |
| Recommendation 5 | Deferred Maintenance Prioritization |
| Recommendation 6 | Wenaokeao - Prioritization of Mode 3 |
| Recommendation 7 | Kealahou Timeline - Prioritization |
| Recommendation 8 | TASc Updates |
| Recommendation 9 | Single Yearly Call for Proposals |
| Recommendation 10 | U-band MegaCam Degradation |
The 109th Science Advisory Council meeting was held remotely on May 19th-21st 2026. All SAC members attended the meeting: Scott Chapman (chair), Katarina Kraljic (vice-chair), Philippe Mathias, Georges Kordopatis, Isabelle Boisse, Mark Chun, Ken Chambers, Ting Li, Alan McConnachie, and Ryan Cloutier. The CFHT Executive Director, Jean-Gabriel Cuby, the (interim) Director of Engineering, Driss Kouach, and the Director of Science Operations, Nadine Manset, all gave presentations and participated in discussions.
Kara Dumaguin was introduced to new members as the CFHT Director of Community Relations.
The Executive Director began with a summary of updates from the CFHT Board of Directors and their recommendations, along with high-level activities ongoing at CFHT since the last SAC meeting.
This included an extensive discussion of the Community Survey process and direction. The agreement with the University of California, Berkeley, Space Sciences Laboratory (UCB-SSL) and the related NAOC partnership renewal were presented, with significant advances and implications since the last SAC meeting. The SAC thanks Jean-Gabriel for the open and proactive approach and involvement with these complicated developments for CFHT and encourages these efforts to continue.
The SAC learned that the potential interest in the use of WIRCam, which is due to be decommissioned at the end of 2026B, is now at least on hold, and may not proceed.
The Executive Director also informed the SAC about severe weather events this past winter and the impact on Maunakea science. Updates were presented on Maunakea Management by the Maunakea Stewardship and Oversight Authority (MKSOA), issues and concerns that will define the process on the new lease, and importantly the discussions regarding access to the mountain and the kānāwai (loosely interpreted as Hawaiian law), on which MKSOA will ground its decision. The SAC again applauds the ED and CFHT for navigating the direction and integrating with these ongoing developments and shifts in philosophy and culture associated with astronomy on Maunakea.
The SAC learned at this meeting that a total of 459 dark hours have been allocated to Associate Partner UCB-SSL across semesters 26B, 27A, and 27B in support of DESI-II, including 340 dark hours in 27A alone -- equivalent to approximately 36 "classical-mode" dark nights. In addition, 13.3 dark nights have been allocated to Associate Partner NAOC in 26B, with a possible extension into 27A. The SAC is pleased to see these new Associate Partner relationships, and notes that the concentration of UCB-SSL dark time in the Feb-Apr 2027 window will effectively block other dark time observations during those runs. This will likely impact both PI programs and the completion of the Large Program UNIONS+ in 27A.
Looking ahead to 27B and beyond, CFHT nights can expect to be fully allocated between PI time, Community Surveys, Engineering Runs, and Directors Discretionary Time. The SAC recommends that, at the outset of the Community Surveys, a certain number of nights per semester are kept in reserve from a combination of CS time and PI nights, for potential use by existing or future Associate Partners. In this way, all stakeholders on the telescope are able to plan on a predictable amount of time each semester, with the likelihood that any extra nights can speed up completion of surveys, or reduce pressure on PI time, while also allowing CFHT to explore new Associate Partnerships. The SAC views the alternative - whereby time to new Associate Partners results in either PI time being reduced further or Community Surveys being unable to depend on a clear allocation of time - as not scientifically credible.
The following recommendation is based on the assumption that CFHT would like to maintain the possibility of exploring new Associate Partnerships.
| Statement: We believe the recommendations in this report will allow CFHT to give a more precise estimate of the number of nights available for community surveys from 27B onwards (current number 400-700 nights bright/grey nights, 400-700 dark/grey), CFHT should confirm if these numbers are reasonable. This is important for the community surveys proposal selection process, and to plan the surveys accordingly. |
The SAC received an update from Ting Li, the chair of the Community Survey Working Group (CSWG), on their activities since the November SAC meeting, including telecons through winter devoted to consolidation of proposing teams and advancing the process towards proposal selection. SAC acknowledges and greatly appreciates the substantial effort that the CSWG has invested in organizing and facilitating the Community Survey process. SAC thanks the CSWG for their hard work and dedication to this complicated and involved task.
SAC was pleased to see the strong community response to the proposal consolidation process, with three proposals being submitted for the Community Surveys. The Wenaokeao focused proposal clearly demonstrates that a coherent community continues to develop its science for the Community Survey. On the MegaCam side, the landscape remains much more focused than six months ago, but there is substantial work to further refine the MegaCam CS surveys, especially in light of the developing landscape with UCB-SSI and DESI-II. SAC reiterates that the over-arching goal of the Community Survey is to reflect the community's scientific interests as broadly as possible and to deliver high legacy value.
The submitted proposals present up to ~15% of non-CFH members. SAC is pleased to see the success of the CSWG and the interest in the CFH and the international community in the new community surveys, as demonstrated by the good response to the Call for Proposals. SAC particularly welcomes the strong interest by the international community in many of the new proposals, which mirrors similar interest in previous CFHT Large Programs.
| SAC Statement: SAC stresses that, in terms of the intellectual contributions of individual members of the proposing team to the formulation of the ideas and science that each proposal holds, the diverse perspective brought by all the team members, irrespective of their nationality, will be the foundation for the future success of CFHT, and this is celebrated. |
Going forward, SAC recognizes the need for clear processes and rules for the addition of new team members to any accepted proposal, beyond the author list of the submitted versions, and beyond the current C-F-H community, which should be driven by the positive impact on future science, the positive impact on the C-F-H community, and where relevant, the requirements of the CFH agencies.
The SAC learned about the steep drop in available nights, particularly for PI dark time as CFHT enters the Community Survey era alongside new partner agreements. This shortage threatens high-priority science projects that rely on specific, targeted observations to succeed. Additionally, the SAC emphasizes the risk this poses to scientific workforce development. Individual PI allocations are crucial for academic mentorship, providing the flexibility supervisors need to fuel fast-turnaround Master's projects or complement data for ongoing PhD research. Given the points above the SAC has considered the direction of PI time allocation.
The 2025B semester was excellent and a completeness of 115.8% was reached. As a result of the poor weather, only 32% of completeness is reached for current 2026A. The team notes that short runs (6n in August, well below the minimum 10-night limit recommended by the SAC) are damageable in terms of monitoring and sampling. They also asked for possible grey or dark time to mitigate the synodic period aliasing - which complicates strongly the detection of habitable zone planets around M dwarfs. Several publications are in preparation.
Due to the very bad weather in the beginning of 26A, the completeness is only 23.6% for this semester (and 25.2% in total). R-band coverage being very critical for Euclid, these observations were prioritized. The team asked for an extension of this program into 27A.
100h of allocated to this LP between 2025B and 2026A. In total a completeness of 75.5% was reached. The team would like to have a tool to upload long lists of targets and generate the OBs without going through CFHT staff. Several publications are in preparation.
In the Executive Director's report, there is also a note about the issues related to CFHT/UNIONS acknowledgements in Euclid publications (section 1.9).
| SAC statement: The SAC supports the director in ensuring that the CFHT and its programmes are well recognized in Euclid publications. |
In response to queries from the PLANETS team, the SAC continues to support the idea that, when possible, long runs should be scheduled with SPIRou; this will become easier in the near future as two CFHT instruments will be decommissioned and Wenaokeao will be coming into service. The SAC fully understands the difficulties involved in using only the bright time on SPIRou. However, given the pressure, this is not a current viable option to have SPIRou mounted on grey/dark time. The situation could be raised at the next SAC meeting if the situation evolves.
SAC heard that there were potentially a lot of contingencies in deferred maintenance that may not be currently accounted for. Addressing deferred maintenance continues to be crucial in supporting the CS direction of CFHT.
Wenaokeao has advanced significantly, thanks to organizational adjustments at IRAP/OMP and CFHT, as well as secured funding, with a delivery at CFHT in September (import tariffs (15-20%) still to be refined). The 2-month delay is due to optics procurement and some non-conformance issues. The mechanical structure is complete, and its system integration is currently being tested in a cleanroom at IRAP. Dichroics have been tested at Pic du Midi, confirming the absence of fringing. However, the coating of the folding mirrors for mode 2 (ESPaDOnS) shows reflectivity below specifications. If this issue is not resolved, the use of ESPaDOnS in mode 3 (with SPIRou) must be considered and prioritized. The SAC is aware that mode 3 degrades the reddest part of the ESPaDOnS spectrum (and the bluest part of the SPIRou spectrum). However, the blue part of the ESPaDOnS spectrum contains essential markers for stellar activity (e.g., H and K Calcium lines, below 400 nm) that must be preserved. Still, in the context of ESPaDOnS, one of the two lens triplets required for beam reduction has curvature and adhesive issues. A replacement triplet has been ordered for August. The mechanical structure and mounts are complete, and system-level AIT began in late April in IRAP's cleanroom. A handling cart for SPIRou/ESPaDOnS integration is being fabricated, and a broadband artificial star (400-2400 nm, f/8) is being assembled for testing in June. Software development includes a guiding system for SPIRou/ESPaDOnS, with mode 3 algorithms to be tested on the artificial star before on-sky validation. Additionally, TCS updates ensure proper Wenaokeao identification and collision prevention.
SAC congratulates the team on the major tasks accomplished as outlined in the presentation. Kealahou has had a productive first half of 2026, with its primary focus on AEON+ integration/rToO development and Wenaokeao integration, while other tasks remain secondary. However, user and system support (including bug fixes and critical operations) often take precedence, consuming significant resources. Despite this, progress has been made, including a milestone in AEON+ integration. Recent efforts include adjustments to MegaCam SNR Mode to support varied ETC aperture settings and bulk target uploads for K1, both implemented rapidly to meet user needs. A significant bug in internal entity derivation processing was also fixed, reducing processing task queues by a factor of 1000. For AEON+, Phase 1 (initial operational capability) is nearly complete, with its final release planned for mid-May 2026, followed by a shift in focus to Wenaokeao. The full AEON+ timeline targets public availability in 2026B, with rToO development spanning 2027 and completion by December 2027. Wenaokeao integration is progressing with a command translation layer to interface between instrument software and Kealahou, allowing seamless operation of SPIRou and ESPaDOnS while mounted on Wenaokeao hardware. The timeline remains unchanged, with full QSO operations expected by Summer 2027. However, considering its importance for ESPaDOnS, despite the greater effort it represents compared to modes 1 and 2, mode 3 should now be prioritized over mode 2. Upcoming projects include MegaCam filter integration and a K2 UI tool for DESI observations, alongside ongoing infrastructure updates.
The SAC appreciates the initiative of the Board to establish the TASc process to aid in the growing associate partnership and grant proposal requests for observing nights. The SAC continues to see value in getting updates from the TASc and being kept informed of all TASc's actions. For this, presentations should be shared enough in advance of TASc meetings, and reports of TASc meetings should be shared with the SAC and Board, ensuring good communication between the several CFHT bodies.
The SAC recognizes the operational complications that a single yearly call introduces to CFHT. Despite these challenges, the significant long-term benefits to the community and the TAC remain clear, particularly at the outset of the Community Surveys in 27B. The SAC maintains the recommendation that CFHT continue to explore this transition from 27B, actively developing a concrete plan to implement a single yearly proposal call along side a quarterly fast turn around process that explicitly addresses the potential operational challenges.
SAC understands the different pressures on CFH with the CfP, and while not urgent, the once yearly cadence continues to be a good direction to consider.
RECOMMENDATION #9: The SAC recommends that CFHT continue to explore this possibility and develop a concrete plan for a single yearly proposal call, along with a quarterly fast turnaround process. |
SAC thanks CFH for the continued work on the M1 and degradation of U-band MegaCam performance. The SAC remains concerned about the decline in u-band throughput, since MegaCam's blue sensitivity is pivotal for the forthcoming community survey where the blue sensitivity of MegaCam is a major interest. The ongoing mitigation and environmental control have been a positive for understanding the issues, and the SAC is confident CFH is managing the situation.
For the November in person SAC meeting at CFHT HQ, the week of Nov 30 - Dec 4 was confirmed.